Past Projects
Mechanical & Electrical Field Services
Sewage Treatment
- Installation and refurbishment of boilers
- Valve / operator upgrading
- Digestor tanks and equipment
- Natural gas & digestor gas piping
- Electrical upgrading project including new gas detection system, exhaust fans, boiler upgrades & flume stack structure
Primary Steel Manufacturing
- Fabrication of steel furnace fume extraction ducting - Water cooled
- Fabrication of all steel making consumables
- Dismantling, repair & reinstallation of electric arc furnace after melt-out
- Overhead crane runway repairs
- Structural steel installations & repairs
- Fabrication of Re-Heat furnace beams
- Fabrication & installation of 21"mill tilt table
- Modifications and installation of ladle cars and scrap bucket cars
Paper Processing
- Process water clarification system
- Compressed air drying system
- 18 foot diameter pulper (400A) including all process piping, mechanical & electrical components
- Routine maintenance and washups
- Infeed conveyor systems including hydraulic system pumps
- Wiring of various pumps, motors and VFD's
- Installation of new paper unwinding & handling equipment
Petroleum Processing
- Complete installation of new sour gas compressor station. Project included the installation of new & used compressors, seperators, electrical control station, storage tanks and over 8,000 feet of piping welded to zero tolerance x-ray code
- Retrofit Brine pump & piping
- Installed hydraulic tubing system
- Complete re-wiring of gas drilling support vessel (acid plant) in compliance with Transport Canada regulations.
- Installation & repair of pumps, motors, & control components on dive/crew boats, supply tugs & drilling rigs
Dry Powder / Bulk Handling & Processing
- Installation of new sand silos, pneumatic conveying equipment and bulk bag handling / loading system
- Fabrication & installation of new 25' diameter silos and material handling equipment
- Structural steel fabrication & installations (frames, platforms, walkways, ladders, etc.)
- Kiln repairs, installation of process piping, and equipment assemblies
- Design, fabrication and installation of M.O.L / CSA compliant machine & belt conveyor safeguarding
- Installation and repairs of large bucket elevators
Installation of 12 million BTU gypsum twin kettle heating system c/w electrical automation
- Assembly, fabrication and installation of 63" rock grinding mill (Raymond Rolling Mill) and all associated equipment c/w 600A electrical feeder and MCC
- Automation of main plant compressors and gypsum wallboard manufacturing lines
- Installation of cement Ball Mill partition walls & liner plates
- Installation of combustion air make-up systems
- Kiln / Rotary Dryer tire, shell and flight repairs, crusher roller repairs & storage bin air cannon installations
- Fabrication and installation of ducts, chutes, transitions, hoppers, etc.
- Installation of new paper unwinding & handling equipment for gypsum wallboard manufacturer
- Cement cooler rebuilds
- Drag chain installations
- Air slide installations
- Kettle bottom replacement
|
 |